TYCS - Sem 5 - Software Testing and Quality Assurance
Who incorporate the procedure to ensure
compliance with software development Project
To perform an effective testing, the project Technical Technical
2 manager should conduct effective review SRS audit Scrum Testing review
3 the following. Simple Loops |Nested Loops |Loops above above
it may be
What happened if an expected result is not we cannot determine if
specified then automate the |the test |. it may . it may
we cannot user input passed or difficult to difficult to
4 run the failed repeat the test |repeat the test
Select the people who identify the document Project All of the
and verifies the correctness of the software... manager SQA team Project team SQA team
7 degree of the design specification... conformance |Control Assurance above conformance
Audits and Amount of Documents
Select which option is not true about SQA...? reviews to be |technical Evaluations are Evaluations
performed work to be be produced by |to be
by the team performed the SQA team |performed
Who identifies, documents, and verifies that Project All of the
corrections have been made to the software? |manager Project team |SQA SQA group
Which of the following is not a SQA plan for a evaluations of audits and produced by of
project? to be technical reviews to be |the SQA technical
The primary objective of formal technical
reviews is to find during the
process so that they do not become defects equivalent none of
release of the software. faults failure cause |mentioned
Integration, |System, Integration, |It depends It depends
Acceptance, |Integration, |System, on the nature |on the nature
order in which test levels are performed is |System Acceptance |Acceptance project project
A system is A system is
In a system more reliable may reliable
two different after lead to faults
Which of the following is false? failures may |A fault need |debugging and debugging
have not affect the |for the eventually to |for the
different reliability of a of removal of a
A deviation from the specified or expected
behavior that is visible to end-users is called
performed?u2 project software has |testing team |None of the |software has
16 manager says |changed. gets the time changed
Which of the following is the largest bug
The _ serves as the template for SQA SQA
includes cost of training developers on Detection Internal External Prevention
22 secure and easily maintainable code. costs costs Failure costs |Failure costs |costs
includes cost of creating test cases,
is in the terms of an end users
defines quality in terms of original
Who incorporate the procedure to ensure
compliance with software development Project
To perform an effective testing, the project Technical Technical
2 manager should conduct effective review SRS audit Scrum Testing review
3 the following. Simple Loops |Nested Loops |Loops above above
it may be
What happened if an expected result is not we cannot determine if
specified then automate the |the test |. it may . it may
we cannot user input passed or difficult to difficult to
4 run the failed repeat the test |repeat the test
Select the people who identify the document Project All of the
and verifies the correctness of the software... manager SQA team Project team SQA team
7 degree of the design specification... conformance |Control Assurance above conformance
Audits and Amount of Documents
Select which option is not true about SQA...? reviews to be |technical Evaluations are Evaluations
performed work to be be produced by |to be
by the team performed the SQA team |performed
Who identifies, documents, and verifies that Project All of the
corrections have been made to the software? |manager Project team |SQA SQA group
Which of the following is not a SQA plan for a evaluations of audits and produced by of
project? to be technical reviews to be |the SQA technical
The primary objective of formal technical
reviews is to find during the
process so that they do not become defects equivalent none of
release of the software. faults failure cause |mentioned
Integration, |System, Integration, |It depends It depends
Acceptance, |Integration, |System, on the nature |on the nature
order in which test levels are performed is |System Acceptance |Acceptance project project
A system is A system is
In a system more reliable may reliable
two different after lead to faults
Which of the following is false? failures may |A fault need |debugging and debugging
have not affect the |for the eventually to |for the
different reliability of a of removal of a
A deviation from the specified or expected
behavior that is visible to end-users is called
performed?u2 project software has |testing team |None of the |software has
16 manager says |changed. gets the time changed
Which of the following is the largest bug
The _ serves as the template for SQA SQA
includes cost of training developers on Detection Internal External Prevention
22 secure and easily maintainable code. costs costs Failure costs |Failure costs |costs
includes cost of creating test cases,
is in the terms of an end users
defines quality in terms of original
Read from the scan above, so a character or two may differ. The scan is the original.
Something wrong on this page? Report it and we will check it against the scan.
Quick Help
No. The full paper opens straight away, with no login and nothing to pay.
Related Resources
Something wrong with this paper? Report it.
Connected Papers
BSc CS / Sem 5 · 57 papers
2019 - Artificial Intelligence
2019 - Computer Science II Advanced Java Programming
2019 - Computer Science II Advanced Java 19 Old
2019 - Computer Science III Mobile Appli. Dev
2019 - Computer Science III Operating System Old
Nov 2019 - GAME PROGRAMMING
Nov 2019 - WEB SERVICES
2019 - Software Testing Quality Assurance
Questions? Email contact@munotes.in
Done!