B.Sc. (Computer Science) Sem 5 Software Testing and Quality Assurance 2020-21 Question Paper - Mumbai University | munotes
Get access to whole semester resourcesSemester Pass
MU B.Sc. (Computer Science) student group
Free to join
This paper is solved: read the model answers.
Loading PDF...
Older exam
Oct 2019
Semester-end · Software Testing and Quality Assurance
→
Newer exam
Dec 2022
Semester-end · Software Testing and Quality Assurance
→
Questions asked in this paper
Solved paper All 25 questions answered in full Exam-ready answers, the reasoning behind each one, and what the examiner is looking for. Open the solutionsSECTION I - Sample Question Bank (Multiple Choice Questions, 1 mark each) 25 Marks
-
1. Who incorporate the procedure to ensure compliance with software development standards. Options: a. Project manager, b. Developer, c. SQA member, d. ClientRead the model answer
-
2. To perform an effective testing, the project manager should conduct effective ____. Options: a. Technical review, b. SRS audit, c. Scrum, d. TestingRead the model answer
-
3. Loop Testing methodology includes which of the following. Options: a. Simple Loops, b. Nested Loops, c. Concatenated Loops, d. All of the aboveRead the model answer
-
4. What happened if an expected result is not specified then ____. Options: a. we cannot run the test, b. we cannot automate the user input values, c. it may be difficult to determine if the test has passed or failed, d. it may difficult to repeat the testRead the model answer
-
5. Select the option which is not an appraisal in SQA? Options: a. inter-process inspection, b. maintenance, c. testing, d. quality planningRead the model answer
-
6. Select the people who identify the document and verifies the correctness of the software. Options: a. Project manager, b. SQA team, c. Project team, d. All of the mentionedRead the model answer
-
7. A product which is manufactured by using the degree of the design specification is ____. Options: a. Quality of conformance, b. Quality Control, c. Quality Assurance, d. None of the aboveRead the model answer
-
8. Select which option is not true about SQA? Options: a. Audits and reviews to be performed by the team, b. Amount of technical work to be performed, c. Evaluations to be performed, d. Documents that are produced by the SQA teamRead the model answer
-
9. Who identifies, documents, and verifies that corrections have been made to the software? Options: a. Project manager, b. Project team, c. SQA group, d. All of the mentionedRead the model answer
-
10. Which of the following is not a SQA plan for a project? Options: a. evaluations to be performed, b. amount of technical work, c. audits and reviews to be performed, d. documents to be produced by the SQA groupRead the model answer
-
11. The primary objective of formal technical reviews is to find ____ during the process so that they do not become defects after release of the software. Options: a. errors, b. equivalent faults, c. failure cause, d. none of the mentionedRead the model answer
-
12. The order in which test levels are performed is ____. Options: a. Unit, Integration, Acceptance, System, b. Unit, System, Integration, Acceptance, c. Unit, Integration, System, Acceptance, d. It depends on the nature of a projectRead the model answer
-
13. Which of the following is false? Options: a. In a system two different failures may have different severities, b. A fault need not affect the reliability of a system, c. A system is necessarily more reliable after debugging for the removal of a fault, d. Undetected errors may lead to faults and eventually to incorrect behaviorRead the model answer
-
14. Test Conditions are derived from ____. Options: a. Test Design, b. Test Data, c. Test cases, d. SpecificationRead the model answer
-
15. A deviation from the specified or expected behavior that is visible to end-users is called ____. Options: a. errors, b. faults, c. defect, d. failureRead the model answer
-
16. When should regression testing be performed? Options: a. When the project manager says, b. After the software has changed, c. Whenever a software testing team gets the time, d. None of the aboveRead the model answer
-
17. What is the main purpose of integration testing? Options: a. Design error, b. Interface error, c. Procedure error, d. noneRead the model answer
-
18. Which of the following is the form of Alpha and Beta Testing? Options: a. Acceptance testing, b. System Testing, c. Unit testing, d. Integration testingRead the model answer
-
19. What is another name for Bug? Options: a. errors, b. Defect, c. Mistake, d. IncidentRead the model answer
-
20. Which of the following is the largest bug producer? Options: a. code, b. design, c. specification, d. otherRead the model answer
-
21. The ____ serves as the template for SQA activities planned for each software project. Options: a. SQA analysis, b. SQA report, c. SQA plan, d. SQA documentRead the model answer
-
22. ____ includes cost of training developers on writing secure and easily maintainable code. Options: a. Prevention costs, b. Detection costs, c. Internal Failure costs, d. External Failure costsRead the model answer
-
23. ____ includes cost of creating test cases, setting up testing environments, revisiting testing requirement. Options: a. Prevention costs, b. Detection costs, c. Internal Failure costs, d. External Failure costsRead the model answer
-
24. In ____, quality is in the terms of an end users goals. Options: a. Transcendental, b. User view, c. Product, d. Value-basedRead the model answer
-
25. ____ defines quality in terms of original specification of the product. Options: a. Transcendental, b. User view, c. Manufacturer's view, d. Value-basedRead the model answer
Read from the scan above, so a character or two may differ. The scan is the original.
Something wrong on this page? Report it and we will check it against the scan.
Quick Help
No. The full paper opens straight away, with no login and nothing to pay.
Related Resources
Something wrong with this paper? Report it.
Connected Papers
B.Sc. (Computer Science) / Sem 5 · 57 papers
Questions? Email contact@munotes.in
Done!