munotes®

BSc CS Sem 4 Software Engineering 2022-23 Question Paper with Solutions

Mumbai University Solved Question Papers munotes.in

Software Engineering

BSc CS · Sem 4

2022-23 Examination

Previous Year Question Paper with Solution

munotes.in Mumbai

munotes.in

First published on munotes.in on 12 November 2026.

This edition revised 13 November 2026.

Published by munotes.in, Mumbai.

Model answers written and edited by the munotes.in editorial desk.

Passages from this volume may be quoted, in print, online or by an AI system, with credit: name munotes.in and link to this volume's page. The volume may not be reproduced as a whole. Full terms at munotes.in/content-license.

munotes.in is an independent study resource for students of the University of Mumbai. It is not affiliated with the University of Mumbai, and is not endorsed by it.

The University does not publish an official answer key for this paper. The answers in this volume are model answers, written to show how a full-mark answer is built. They are a study aid, not an authority on what an examiner marked.

The question paper reproduced here is the paper as set by the University of Mumbai at the 2022-23 examination.

munotes.in ii
munotes.in iii
munotes.in iv

The Paper as Set

The questions in this volume are the questions asked at the 2022-23 examination, reproduced as the University of Mumbai set them, in the order it set them. Nothing has been reworded, added or left out. Only the answers are ours. See the original question paper.

Duration 2½ hours  ·  Total marks 75  ·  18 questions answered

How to use this volume

Solve the paper first, under exam conditions and against the clock. Then read the answers here and mark your own. Reading a solution before attempting the question feels productive and teaches very little, because recognising an answer is not the same as being able to write one.

munotes.in v

SECTION I

Q.1 Attempt the following

Any Four · [20 Marks]

munotes.in 1

a.What is Software Engineering? Explain Software Process.[5]

Answer

For full marks, cover: the standard definition of software engineering and what each key word means; what a software process is; its activities, actions and tasks; the five framework activities; the umbrella activities; a diagram; one example.

Software engineering

The vocabulary standard defines it in two parts. Software engineering is the "application of a systematic, disciplined, quantifiable approach to the development, operation, and maintenance of software". In short, it is "the application of engineering to software".

  • Systematic: the work follows planned steps, not trial and error.
  • Disciplined: the team keeps to agreed rules, such as reviews and standards, even under deadline pressure.
  • Quantifiable: progress and quality are measured, such as size, effort, cost and faults found.
  • Development, operation and maintenance: it covers the whole life of the software, not only writing the code.
munotes.in 2

So software engineering is more than programming. Programming is one activity inside it.

Software process

A process is a "set of interrelated or interacting activities that transforms inputs into outputs". A software process is the framework of activities, actions and tasks needed to build good software.

  1. Framework activities are the broad kinds of work done on every project.
  2. Software engineering actions sit inside each activity. Communication, for example, holds requirements gathering.
  3. Task sets sit inside each action. They list the work tasks, the work products, the quality checkpoints and the milestones.

The five framework activities are:

  1. Communication: talk with the customer and users to understand the requirements.
  2. Planning: list the tasks, risks, resources and work products, and make a schedule.
  3. Modelling: build analysis and design models before writing code.
munotes.in 3
  1. Construction: write the code and test it.
  2. Deployment: deliver the software; the customer uses it and gives feedback.

Umbrella activities run across the whole project. They are tracking and control, risk management, quality assurance, technical reviews, measurement, configuration management, reuse management and work product preparation.

Diagram: a long bar labelled umbrella activities runs across the top. Under it, five boxes stand in a row, joined by arrows: Communication, Planning, Modelling, Construction, Deployment.

A process is adaptable. A small project may finish communication in one meeting; a large one needs many actions in each activity.

Example (our own)

For a hostel fee portal, communication meets the warden and students. Planning fixes a six-week schedule. Modelling designs the fee screens. Construction codes and tests them. Deployment puts the portal live for the new term.

munotes.in 4

Conclusion. Software engineering is the systematic, disciplined and quantifiable approach to building and keeping software. A software process organises that work into five framework activities, supported by umbrella activities.

munotes.in 5

The rest of the answers

The first answer is free. The rest come with the B.Sc. (Computer Science) Semester 4 solved papers.

You have read the question paper and its first answer in full. Buy the solved papers once and you can read every answer of every solved paper in this semester.

Notes + practical solutions + solved papers: ₹798 Already bought it? Sign in

Or solved papers only: ₹499