Master of Management Studies (M.M.S) Manufacturing Resource Planning and Control Syllabus - Mumbai University 2026
This is the M.M.S. syllabus under NEP 2020, in force from the academic year 2025-26: Semesters I and II from the revised circular and Semesters III and IV from the new one, both approved by the Academic Council on 20 May 2025. The earlier choice-based syllabus is still set alongside it for repeating candidates, so check which scheme your exam form names before you revise.
Loading syllabus...
Syllabus for Manufacturing Resource Planning and Control
Course objectives
- 1 To familiarize students with core concepts, techniques, and systems in manufacturing resource planning.
- 2 To equip students with practical skills in material requirements planning (MRP), scheduling, and inventory control.
- 3 To develop analytical capabilities for evaluating production capacity, demand forecasting, and resource utilization.
- 4 To enable students to apply lean manufacturing principles and quality control methodologies.
- 5 To foster understanding of contemporary trends and technological advancements in manufacturing planning.
Course outcomes
- CO1: Choose appropriate Production planning to achieve business plan
- CO2: Compare manufacturing resources available and select right ones to optimize cost
- CO3: Identify ways to manage demand and capacity planning
- CO4: Analys best practices followed for Material Requirement Planning
- CO5: Evaluate how implementing ERP system can help organizations to operate and monitor
- CO6: Create manufacturing resource plan based on understanding of concepts
Unit 1 CO1, CO2 · 3 hours
Overview of operations planning and control, challenges in securing a competitive edge, understanding Enterprise Resource Planning and its linkage with functional units, Customised Software, data integration; integrating MPC with ERP; performance metrics to evaluate effectiveness
Unit 2 CO2, CO3 · 3 hours
Demand management and the MPC environment (MTS, ATO, MTO); communicating with other modules like Sales & Operations Planning, Master Production Scheduling; information use in demand management; CRM; balancing supply and demand; Collaborative Planning, Forecasting and Replenishment (CPFR); 9-step CPFR process model
Unit 3 CO2, CO3 · 3 hours
Sales and Operations Planning: S&OP fundamentals, planning and management; payoffs; S&OP process, displays, basic trade-offs, economic evaluation of alternate plans; new management obligations, functional roles, integrating strategic planning, controlling the Operations Plan; Lawn King Inc case
Unit 4 CO2, CO3 · 3 hours
Master Production Scheduling; MPS activity, statement of future output, business environment for MPS, other linkages; MPS techniques – time-phased, rolling through time, Order Planning and ATP; planning in an ATO environment; 2-level MPS; MPS stability-freezing and time-fencing; managing MPS
Unit 5 CO2, CO3 · 3 hours
Material Requirements Planning; MRP in MPC; record processing – basic MRP record, linking records; technical issues-processing frequency, bucketless systems, lot sizing, pegging, FPOs, service parts, planning horizon; Scheduled Receipts vs Planned Order Releases; using the MRP system; system dynamics
Unit 6 CO3, CO4, CO5 · 3 hours
Capacity Planning and Management; role in MPC systems, hierarchy of decisions, links to other MPC modules; capacity planning and control techniques – CPOF, Capacity Bills, Resource Profiles, Capacity Requirements Planning (CRP); finite capacity scheduling, using APS systems; management and capacity planning utilisation. Managing bottleneck capacity, choosing measure of capacity, choice of technique, using the capacity plan
Unit 7 CO3, CO4, CO5 · 3 hours
Production Activity Control; framework, MPC system linkages, linkages between MRP and PAC, JIT effect on PAC; Production Activity Control techniques, concepts, lead-time management, Gantt Charts, Priority Sequencing Rules, Theory of Constraints (TOC), Vendor Scheduling and follow- up, influence of internet
Unit 8 CO3, CO4, CO5 · 3 hours
Advanced Scheduling and Just-in-Time; basic scheduling research, 1-machine, 2-machine, dispatching and sequencing rules; advanced procedures-due date setting, dynamic due dates, labour-limited systems group scheduling and transfer batches: major elements of JIT its impact on MPC and applications, hidden factory; levelling production, pull system introduction, product and process design
Unit 9 CO3, CO4, CO5 · 3 hours
Distribution Requirements Planning; DRP in the Supply Chain, MPC system linkages, marketplace, demand management, MPS; DRP techniques – basic DRP record, TPOP, linking multiple warehouse records, managing day-to-day variations from plan, safety stock; management issues – data integrity, organisational support, problem-solving
Unit 10 CO3, CO4, CO5 · 3 hours
Management of Supply Chain Logistics; framework for supply chain logistics, breadth of supply chain logistics, total cost concept; design, operation and control decisions; supply chain logistical elements – transportation, warehouses, inventory; warehouse replenishment systems; warehouse location analysis;
Textbooks
- 1 Manufacturing Planning and Control for Supply Chain Management, 6e; F Robert Jabobs, William Berry, D Clay Whybark, Thomas Vollmann; Mc Graw Hill
Reference books
- 1 Designing and Managing the Supply Chain – Concepts, Strategies and Case Studies, 4e; David Simchi-Levi, Philip Kaminski, Edith Simchi-Levi, Ravi Shankar; Mc Graw Hill
Reproduced from the University of Mumbai syllabus for Master of Management Studies (Two Year), Semester III and IV, AC 20/05/2025, Item No. 7.11 (N), in force from the academic year 2025-26. Wording and unit numbering are as printed there. The PDF above is the syllabus's own page, unaltered.
The complete syllabus
This subject is cut from the University circular for its semester. Open a document here if you want the whole thing rather than a single subject.